![First Floor IT-02, CP-05, Sector 8, IMT Manesar](https://jll-global-gdim-res.cloudinary.com/image/upload/f_avif,ar_1.0,c_fill,w_1920,q_auto/v1618392466/IND/OLM/Data%20Center/JLL_GUR_OPR1_GUR1_Ext_Primary.png)
Data Centre
Property ID: IND-DC-000003data-centreJLL_OPR1_GUR1
First Floor IT-02, CP-05, Sector 8, IMT Manesar
Sector 8, Manesar
Please contact us for price
- Size2,109.726 - 5,877.095 sqft
- Description
- Building Information
- Location
Description
Cloud, Dedicated & Shared Hosting, Managed Services, Manesar, NCR
A strategically located facility operated by a leading telecom operator offering 4G and VoLTE services.
• 99.995% uptime
• 6 multi-layer security
• High-density racks
• Green power
Certifications: ISO/IEC 27001, ISO 22301, ISO/IEC 20000-1, ISO 45001, ISO 14001, ISO 9001, TIA 942, SOC 1 TYPE II & SOC 2 TYPE II , ISO 27017
A strategically located facility operated by a leading telecom operator offering 4G and VoLTE services.
• 99.995% uptime
• 6 multi-layer security
• High-density racks
• Green power
Certifications: ISO/IEC 27001, ISO 22301, ISO/IEC 20000-1, ISO 45001, ISO 14001, ISO 9001, TIA 942, SOC 1 TYPE II & SOC 2 TYPE II , ISO 27017